Pages

Monday, September 03, 2012

August Progress

What a fun month we had, full of many cool adventures.  And I even had some time to work on crafty stuff:


August Goals:

1. Commissioned Quilt

I am sewing  a quilt out of some cherished clothing.  Each star is made out of one shirt (I have 7 that I am working with).  This month I was able to make 5 more stars - 12 to go!  I will be putting sashing around each star to make them stand out.





2. August OLW prompt
I have my photo but haven't actually executed the prompt.  Will be on my September list.

September Goals:

1. Commissioned Quilt
2. August and September OLW prompts
3. Studying for ground training (I'm learning to become a pilot so I can FLY!)

Other projects that are on my list (for me to tackle in the future):


1. Use the beautiful fabric sent to me from Jolene (Blue Elephant Stitches). 
2. Make a quilt for Olivia (I already have the fabric)
3. Joshua's baby books (put pictures in the beautiful book my friends made for us, and make him a shutterfly baby book).
4. Deal with my photos:
a) print and put in albums Sept 2009 to November 2010, and 2012 (April to present)
b) deal with the huge box of photos under my desk (2005-2009)
5. Hang up photos and artwork we have framed on our walls.
6. December Daily 2011.

No comments:

LinkWithin

Related Posts with Thumbnails